TWY Mont Kiara Residence
Client : Top International Engineering (Malaysia) Sdn BhdStatus : Completed (Arbitration Proceeding) Proposed development of 484 units of 51-floors of 2 blocks service apartment including 7 floors prodium & 3 basement carpak at Lot 57503, Jalan Mont Kiara, Kuala Lumpur.
Dato Vinod Bangalow
Client :Datuk Vinod & Datin WinyStatus : Design Stage Design/Construction of new and enlarged built-up area across the 3 lots to achieve a single large/ contigious residence for Datuk Vinod & Datin Winy. The total area of 3 lot is 4,955sm (1.2 acres). Lots 45071 and 28143 are located at the upper Jalan Nusa cul-de-sac […]
Refurbishment of PETRONAS Resources Centre
Client : Petroliam Nasional BerhadStatus : Completed Proposed transformation and enhancement of the petronas resource centre as an annovation hub at level 4, tower 1, Kuala Lumpur.
Refurbishment of Petra Group HQ
Client : Petra GroupStatus : Design Stage Location at Damansara Petaling Jaya Selangor. Total office space 74,135sq ft .Has 23 Level floor. Focus on office and ground floor design concept
RedQ – Air Asia Headquarters
Client : Air Asia BerhadStatus : Completed 2016 Located at Lapangan Terbang KLIA. Covering area of approximately 4.8 acres. The project site is locate beside the new low Cost Terminal of (KLIA 2). GFA for 7-storey offices is 480,000ft2 and 4- storey carpark is 564,000ft2 excluding future extension structural provision.
Cruise Jetty
Client : Melaka International Cruise Terminal (MICT)Status : Design Stage The Cruise Jetty of MICT is located in Melaka Gateway development area in Bandar Hilir, Melaka Tengah, Melaka, Malaysia. It was designed to accommodate gigantic cruise ship ever exist in the world like Oasis of the Seas, Harmony of the Seas and even Symphony of […]
Maju Intan Biomass Power Plant
Client : Colben Engineering HoldingsStatus : Completed 2014 Colben Energy (Maju Intan) is the Joint Venture partner with Maju Intan Biomass Power Plant in Teluk Intan, Perak, Malaysia. Maju Intan Biomass Power Plant is located in the vicinity of over 20 palm oil mill processors. Maju Intan Biomass Energy Sdn Bhd (“MJE”) had on March […]
SK Nexilis Copper Foil Manufacturing Plant
Client : Heerim Architect & Planner.Co Ltd An Electric Vehicle (EV) Components manufacturer, SK Nexilis Copper Foil Manufacturing Plant, is located in Kota Kinabalu Industrial Park 9 (KKIP9), Sepanggar, Kota Kinabalu, Sabah is a 3-floors factory with GFA of approximately 150,000 sqm. The facilities include 7 academic blocks, 5 accommodation blocks, multi-function hall, computer and […]
Mont’ Kiara Child Enrichment Centre
Client : M.S.Tan CorporationStatus : On-going Development of Temporary F&B Complex on Lot 1872, Mont Kiara Kuala Lumpur, a 3.03 acre site on Jalan Kiara. Project to develop 2-storey complex comprising of 8 semi-detached retail blocks of about 9000sqm.
ZETA Park
Client : Fitters Engineering Service Sdn BhdStatus : Completed 2015 The site of this project is approximately 10 acres in size. The proposed mix development project is split up into two phases of works. The Proposed Phase 1 Works, consists of the execution and completion of the piling works, the construction of three levels of […]